sincstoreShowcase Your Products
AU flag AU
UK flag UK AU flag AU US flag US AE flag AE DK flag DK SE flag SE BR flag BR IN flag IN VN flag VN CA flag CA NZ flag NZ DE flag DE FR flag FR CN flag CN ES flag ES IT flag IT CH flag CH NL flag NL PL flag PL LU flag LU SG flag SG HR flag HR RU flag RU JP flag JP
Bimstore
  • Browse
  • Manufacturers
    • All manufacturers

      Browse all our manufacturers

    • I'm a manufacturer

      Learn more about hosting on Bimstore

    • Featured
      • Image
        Grohe

        Luxury plumbing fixtures

      • Image
        JCB

        Leading manufacturer of construction equipment

  • Collections
  • Insights
    • All
    • News
    • Case Studies
    • Videos
    • Magazine
    • Webinars
  • LoginSign up

Conex Bänninger: Press-fit technology on ACR project helps P&R Heating save over a week in time

Gloucestershire-based P&R Heating calculated it managed to save days on a recent project to renew Gloucester Library’s air conditioning system by simply switching from traditional brazing methods to press-fit technology.

P&R Heating, a mechanical and electrical installation and service contractor, has been working within the local authority and commercial markets for over 30 years.


During this time, the company has developed an excellent reputation for the first-class service it provides its customers.

On one of its latest contracts, P&R Heating was replacing the old air conditioning system at Gloucester Library. The new system was needed to effectively control the humidity in the important stored documents area within the library. P&R Heating decided to trial press-fit technology for the first time over brazing. It was this decision that has ended up being been a complete game-changer for P&R Heating, and the company now will never look back.

I’d definitely use >B< MaxiPro again.

Ben Smailes, an engineer at P&R Heating who has over 26 years of experience in the sector, commented: “We’ve been using flame-free press jointing on plumbing and heating projects that we’ve worked on for a number of years based on its speed and ease of installation. However, this was the first time we’ve decided to switch from braze to press on an air conditioning job.

“The reason for this was simple. As a business, we are constantly looking at ways we can raise the bar and utilise innovative solutions that will not only enable us to get the job done more efficiently, but can also save us time and money.

“Press-fit technology has been around in the ACR sector for a while now, but it’s never really taken off. However, there’s been a lot of talk recently about the investment that manufacturers are making to bring more advanced press-fit solutions to the market, like Conex Bänninger’s new >B<MaxiPro solution.

“I’d heard about >B< MaxiPro via Twitter and my colleague had read about it in the trade press, so we decided now was the time to give it a try! We contacted Conex Bänninger and were directed to our nearest merchant stockist to order.”

Conex Bänninger’s >B<MaxiPro is an innovative press system that is quick and simple to install, providing a secure and permanent leak-free joint. Utilising 3-point-press-technology (one press each side of the bead and one compressing the O-ring), >B< MaxiPro is designed for use in systems with operating pressures of up to 48 bar and is available in a host of fittings types including: Straight Coupler, Reducing Coupler, Fitting Reducer, 90° Bend, 90° Street Bend, 45° Obtuse Elbow, Equal Tee and Stop End variants.

Ben continued: “We used approximately 100 fittings on the Gloucester Library project, so there were roughly 200 joints to be made. Following the initial preparation of the joint, it only takes up to five seconds to complete using a press tool. This is approximately three times faster than traditional brazing.

“It’s not just the speed of jointing that saves you time though. Because it’s flame-free, you don’t need a hot works permit on-site, which also saves valuable time and money and means it makes minimal disruptions to the commercial environment you are working in. We also saved valuable time by not having the carry out complicated risk assessments that you have to do with brazing, which can sometimes take up to two hours a day.

“We, therefore, calculated that because we used press-fit technology, across the whole project, it has saved us a number of days in time compared to if we were brazing. This is a massive amount of time saved for any business, enabling us to complete the project much quicker. In addition, the time we saved more than covered the investment we made in the press tool on this one job alone!“

Engineers from P&R Heating completed Conex Bänninger’s >B<MaxiPro certified training course before the start of the Gloucester Library project to ensure they were confident and competent using this solution. The course includes a complete overview of the product and its benefits, along with giving engineers and contractors the opportunity to use Rothenberger’s press tool and jaws for >B< MaxiPro installations, the recommended press tool for this solution. By completing the course, the guarantee on >B< MaxiPro installations is increased to five years against manufacturing defects.

“I’d definitely use >B< MaxiPro again,” concluded Ben. “In fact, I’d never use anything else again unless I absolutely have to. There are a whole host of benefits why. Most importantly, it just makes a job so much easier and quicker.”

>B< MaxiPro fittings can be used with annealed, half-hard or hard copper tube that conforms to EN 12735-1 or ASTM-B280 in air conditioning and refrigeration applications. The fittings are available from a number of merchants and wholesalers, nationally. >B< MaxiPro is also approved for use with a range of refrigerants, including R-32, R-134a, R-404A, R-407C, R-407F, R-410A, R-507, R1234ze, R1234yf, R-718, R-450A, R-513A, R-448A, R-449A, R-407A, R-427A, R-438A, R-417A and R-422D.

For further information on Conex Bänninger and their range of commercial solutions, please go to conexbanninger.com

Published

08.11.2021

Views

2.5k

Category

News

Share

Logo: Conex Bänninger

Conex Bänninger

  • 4.7k
  • 0
  • - / 5
Product: >B< MaxiPro System

>B< MaxiPro Complete System

by Conex Bänninger

  • Store
    • Categories
    • Collections
    • Manufacturers
    • Virtual Showroom
    • Bimstore Connect
    • VR / AR Experiences
    • Bimstore Node
  • Support
    • Pricing
    • Services
    • Bimstore Bible
    • BIM Content Creation
    • Marketing Services
    • Digital Content Services
    • BIM Integrations
    • Autodesk Revit Plug-In
  • Insights
    • All
    • News
    • Case Studies
    • Videos
    • Magazine
    • Webinars
  • About
    • About
    • Contact Us
  • Follow Us
    • Newsletter
    • LinkedIn
    • Twitter
    • Instagram
AU flag AU
UK flag UK AU flag AU US flag US AE flag AE DK flag DK SE flag SE BR flag BR IN flag IN VN flag VN CA flag CA NZ flag NZ DE flag DE FR flag FR CN flag CN ES flag ES IT flag IT CH flag CH NL flag NL PL flag PL LU flag LU SG flag SG HR flag HR RU flag RU JP flag JP

Terms & ConditionsPrivacy PolicyCookie PolicyFAQs

© Bimstore 2025 a spacegroup company

This site uses cookies. By continuing to browse this site you are agreeing to our use of cookies. Find out more here.

Accept