sincstoreShowcase Your Products
AU flag AU
UK flag UK AU flag AU US flag US AE flag AE DK flag DK SE flag SE BR flag BR IN flag IN VN flag VN CA flag CA NZ flag NZ DE flag DE FR flag FR CN flag CN ES flag ES IT flag IT CH flag CH NL flag NL PL flag PL LU flag LU SG flag SG HR flag HR RU flag RU JP flag JP IE flag IE BE flag BE AR flag AR BO flag BO CL flag CL CO flag CO CR flag CR EC flag EC SV flag SV GT flag GT HT flag HT HN flag HN MX flag MX NI flag NI PA flag PA PY flag PY PE flag PE DO flag DO UZ flag UZ VE flag VE AT flag AT FI flag FI NO flag NO TR flag TR KR flag KR EG flag EG ZA flag ZA SA flag SA PT flag PT EE flag EE LV flag LV LT flag LT GR flag GR UY flag UY
Bimstore
  • Browse
  • Manufacturers
    • All manufacturers

      Browse all our manufacturers

    • I'm a manufacturer

      Learn more about hosting on Bimstore

    • Featured
      • Image
        Grohe

        Luxury plumbing fixtures

      • Image
        JCB

        Leading manufacturer of construction equipment

  • Collections
  • Insights
    • All
    • News
    • Case Studies
    • Videos
    • Magazine
    • Webinars
  • LoginSign up

Thread of Change: The Evolution and Future of BIM

Fifteen years ago, I became interested in something called 'building information modelling' (BIM). At the time, this had just become more visible to us lawyers following the promotion of BIM by the then UK government and the original BIM mandate announced in the Government Construction Strategy of May 2011.

Back then, BIM was beginning to gain traction as a tool for improving calibration andefficiency in construction projects. It was underpinned by the Publicly Available Specification (PAS) 1192. PAS 1192-2 dealt with using BIM in the construction phase, PAS 1192-3 covered BIM in the operational phase and, later, PAS 1192-5 addressed the security aspects of BIM. PASs are often a precursor to more developed forms of standards and this proved to be no exception in the case of BIM, as I will explain later.

I was curious about BIM because it was something new – an application of information management and technology into the building process. Also, as part of the government’s drive to reduce the costs locked into the building process, and as a result of its promotion of BIM in particular, BIM began to gain some traction in this early period from 2010 to 2015.

Early developments

In those days, BIM was rarely mentioned at all in building contracts. Indeed, most people had never heard of it (which unfortunately is in some areas still the case today). But the UK government had mandated the use of Level 2 BIM for all public sector projects by April 2016 and while I am not convinced that this was ever entirely achieved, at least setting this goal helped to push BIM forward.

The idea behind BIM 'levels' was to describe the series of stages that BIM would go through as it developed, moving from its initial characterisation of 'next-level CAD' through to a fully developed 3D virtual model of a building during its design and construction phase into which all parties could contribute – permitting the construction of the building virtually prior to the actual asset being constructed.

The motive was to reduce, as far as possible, costly clashes and variations occurring during the build phase, often the most expensive part of any building project. As the years have progressed, and BIM has become used more often in this capacity, this has indeed achieved some significant success.

Beyond modelling

The problem is this is not the whole story. BIM was never intended just to be a way of producing a 3D virtual model of an asset for use in the design and construction phase: it is, in fact, a subset of the much larger Information Management (IM) arena, which encompasses the entire lifecycle of the asset from the initial concept and design phase through the construction phase then into the operational phase and on to final refurbishment/demolition/repurposing.

This development, from a concentration on the design/construct phase to a much broader IM-based approach, was underpinned by the development of the equivalent International Standard to replace the PAS 1192 series: the game-changing ISO 19650, which internationalised BIM or, as it might be more accurately termed, (B)IM.

ISO 19650 mirrored the PAS series in a number of ways (with ISO 19650–2 replacing PAS 1192-2, ISO 19650-3 replacing PAS 1192-3 and so on). However, there were also differences, with the emphasis moving away from BIM 'levels' to a much more complexand nuanced view of the development of the use of IM throughout an asset’s lifecycle.

The Golden Thread

Alongside the shift from BIM to IM, we saw the UK BIM Alliance changing its name to 'nima' to emphasise the move away from focussing on BIM alone and also, perhaps, to remind those engaged in the IM process of the 'thread' of digital information management that runs through the asset lifecycle – 'nima' is Greek for 'thread'.

Of course, this is also more recently echoed in the 'golden thread' of digital information,which is now required throughout the lifecycle of any Higher Risk Building (HRB) under the provisions of the Building Safety Act 2022 (BSA 2022).

The BSA 2022 is a significant leap in the development of IM: for the first time, legislation now mandates the creation and maintenance of a digital bank of information linked to the design, construction and maintenance of a particular class of building and this must be properly completed, failing which the building cannot move from design to construction to occupation.

It must also be properly maintained during occupation. Those who drafted the original golden thread guidance and developed the relevant regulations are also hoping that, once the obvious advantages of having this golden thread available become apparent to the market, it will increasingly be used on all buildings, not just HRBs.

So, over time, BIM has moved from one fairly self-contained part of the information management market to be developed into a much more all-embracing IM arena, backed by nima as the hub for information management professionals and the guardian of the IM Initiative encouraging wider implementation of the UK’s ISO 19650 framework. Also, internationalising (B)IM through ISO 19650 means it is now far more usual to see the use of 'BIM models' in construction projects.

What Next?

Some of the many exciting challenges now are to expand the use of IM proceduresacross the lifecycle of an asset, increase the consciousness of the need to carry out appropriate security checks through the use of ISO 196505, and to continue to develop the use of IM and integrate it with other technologies like the Internet of Things and VR/AR.

There are also still basic problems to overcome: while most people have heard of BIM,how many actually use it and how many realise that it is simply a subset of the much larger IM arena?

More fundamentally, issues relating to interoperability (the effective and efficientexchange of information between systems such that the information can be verified,stored, reused and relied upon) is still an issue for many users.

Aside from my role in nima, it’s been fascinating for me as a lawyer to watch how this has also begun to develop in the legal system. Many in my profession have been unaware of BIM or just considered it to be a technical issue.

In fact, this area is, perhaps uniquely, an intertwining of the legal and the technical. The development of template information management protocols underpinning ISO 19650-2 and -3 have helped those lawyers not particularly familiar with this area to understand the legal requirements inherent in the ISO process, and these are also beginning to be used more regularly than has been the case for some years.

Where next? The upward trend of awareness and adoption of IM will continue, thanks to ISO 19650 and the golden thread in HRBs. Central to the IM journey, particularly inrelation to the increasing use of AI, is the need for the construction sector to understand the intrinsic value of information and the need to ensure that the information is trustworthyand of good quality. I have no doubt the IM arena will continue to develop, expand and integrate more closely with more recent developments, such as the national digital twinproject and the increasing use and development of AI in construction (and other) processes.
For more about building safety and the golden thread visit our Building Safety Hub.
 

This article originally featured on the PBCT website.  

Published

02.02.2026

Views

18

Category

News

Share

  • Store
    • Categories
    • Collections
    • Manufacturers
    • Virtual Showroom
    • Bimstore Connect
    • VR / AR Experiences
    • Bimstore Node
  • Support
    • Pricing
    • Services
    • Bimstore Bible
    • BIM Content Creation
    • Marketing Services
    • Digital Content Services
    • BIM Integrations
    • Autodesk Revit Plug-In
  • Insights
    • All
    • News
    • Case Studies
    • Videos
    • Magazine
    • Webinars
  • About
    • About
    • Contact Us
  • Follow Us
    • Newsletter
    • LinkedIn
    • Twitter
    • Instagram
AU flag AU
UK flag UK AU flag AU US flag US AE flag AE DK flag DK SE flag SE BR flag BR IN flag IN VN flag VN CA flag CA NZ flag NZ DE flag DE FR flag FR CN flag CN ES flag ES IT flag IT CH flag CH NL flag NL PL flag PL LU flag LU SG flag SG HR flag HR RU flag RU JP flag JP IE flag IE BE flag BE AR flag AR BO flag BO CL flag CL CO flag CO CR flag CR EC flag EC SV flag SV GT flag GT HT flag HT HN flag HN MX flag MX NI flag NI PA flag PA PY flag PY PE flag PE DO flag DO UZ flag UZ VE flag VE AT flag AT FI flag FI NO flag NO TR flag TR KR flag KR EG flag EG ZA flag ZA SA flag SA PT flag PT EE flag EE LV flag LV LT flag LT GR flag GR UY flag UY

Terms & ConditionsPrivacy PolicyCookie PolicyFAQs

© Bimstore 2026 a spacegroup company

This site uses cookies. By continuing to browse this site you are agreeing to our use of cookies. Find out more here.

Accept