VueSincNodeStoreShowcase Your Products
AU
UK US AE DK SE BR IN VN CA DE FR CN ES IT CH NL PL LU SG HR RU JP IE BE AR BO CL CO CR EC SV GT HT HN MX NI PA PY PE DO UZ VE AT FI NO TR KR EG ZA SA PT EE LV LT GR UY
Bimstore
  • Browse
  • Manufacturers
    • All manufacturers

      Browse all our manufacturers

    • I'm a manufacturer

      BIM Content Creation & Hosting Solutions

    • Featured
      • Image
        Grohe

        Luxury plumbing fixtures

      • Image
        JCB

        Leading manufacturer of construction equipment

  • Collections
  • Insights
    • All
    • News
    • Case Studies
    • Videos
    • Magazine
    • Webinars
    • CPDs
  • LoginSign up

wienerberger begins construction on world’s first fully electric roof tile kiln at Broomfleet

wienerberger UK & Ireland has begun construction on the world’s first fully electric tunnel kiln for the manufacture of clay roof tiles at its Broomfleet roof tile manufacturing site in East Yorkshire, marking a major milestone in the company’s long‑term decarbonisation strategy and its ambition to transform heavy clay manufacturing.

The electric kiln in “Factory e” will replace the conventional natural‑gas-powered firing processes with a 100% electric, renewable‑powered system. Once operational, the new kiln is expected to reduce Scope 1 carbon emissions from this factory production line by 75%, saving 4,700 tonnes of CO₂ per year, while maintaining product quality and performance.

The project represents a £37 million investment in UK manufacturing, with £4.3 million funded through the UK Government’s Industrial Energy Transformation Fund (IETF), which supports industrial fuel‑switching and energy efficiency projects to help decarbonise hard‑to‑abate sectors. By removing natural gas entirely from the roof tile firing process, Factory e will play a critical role in supporting wienerberger’s transition to net‑zero carbon emissions, while strengthening the long‑term future of roof tile production at Broomfleet.

Factory e will replace a disused factory line at Broomfleet, during which the old manufacturing equipment will undergo complete replacement, enabling the move to electric firing to be delivered without interrupting ongoing product. Construction activity is now underway on site, with the former factory building cleared and extensive civil engineering works in progress. Key equipment has begun arriving on site in preparation for installation.

Keith Barker, Chief Operating Officer at wienerberger UK & Ireland, said:

“The start of construction at Broomfleet represents a pivotal step in our journey to decarbonise heavy clay manufacturing. Factory e demonstrates how electrification can deliver substantial carbon emission reductions while maintaining product quality, operational resilience and long‑term competitiveness. Alongside our hydrogen brick kiln project at Denton, it underlines our multi‑technology approach to achieving net zero and our commitment to building for what’s next.”

Mark Brook, Operations Director at wienerberger UK & Ireland, added:

“Factory e will fundamentally change how roof tiles are made at Broomfleet. We are installing the first electric kiln of its kind for clay roof tiles, alongside modern automation and control technology that improves safety, efficiency and consistency. The same raw materials will be used, and extensive trials and testing give us confidence that product quality will remain unchanged. We are also investing significantly in our site workforce, creating development opportunities as we upskill teams to use the latest technology.”

The Factory e project is planned to be completed in 2027, reflecting the complexity of delivering a fully electric tunnel kiln and the associated upgrades required to power the new factory line. As part of the transition, production and engineering teams are being trained and upskilled to operate and maintain the new, more automated equipment. The electrified line will primarily manufacture plain tiles and related accessories, fully replacing the existing gas‑fired kiln previously used for this production.

The Broomfleet electric kiln forms a key part of wienerberger UK & Ireland’s wider decarbonisation programme, alongside its hydrogen‑fuelled kiln project at Denton brickworks. Together, these investments showcase a multi‑technology pathway to reducing industrial emissions and accelerating the transition to low‑carbon manufacturing across the company’s UK operations.

Discover more about wienerberger’s ambitions to decarbonise operations as part of its sustainability strategy.


To explore further or to download BIM objects from wienerberger, simply join Bimstore for free access to their products and accompanying literature. For additional insights, visit their manufacturer profile on Bimstore, their company website or socials.

More from wienerberger

Published

18.09.2026

Views

62

Category

News

Share

Logo: Wienerberger Ltd

wienerberger

News

wienerberger secures funding to deliver the world’s first commercial scale hydrogen fired brick kiln

wienerberger UK & Ireland has successfully secured government-backed funding that will enable its landmark hydrogen kiln project at its brickworks in Denton, Greater Manchester, to proceed - marking a major step towards the decarbonisation of the UK’s heavy clay manufacturing industry.

Read more
  • 1.8k
  • 0
  • - / 5
Product: Wienerberger Brick Specials

Wienerberger Brick Specials

by wienerberger

  • Store
    • Categories
    • Collections
    • Manufacturers
    • Virtual Showroom
    • Bimstore Node
    • Bimstore App
    • Bimstore Vue
  • Support
    • Pricing
    • Services
    • Bimstore Bible
    • BIM Content Creation
    • Marketing Services
    • Digital Content Services
    • BIM Integrations
    • Autodesk Revit Plug-In
  • Insights
    • All
    • News
    • Case Studies
    • Videos
    • Magazine
    • Webinars
  • About
    • About
    • Contact Us
    • Trust Centre
  • Follow Us
    • Newsletter
    • LinkedIn
    • Twitter
    • Instagram
AU
UK US AE DK SE BR IN VN CA DE FR CN ES IT CH NL PL LU SG HR RU JP IE BE AR BO CL CO CR EC SV GT HT HN MX NI PA PY PE DO UZ VE AT FI NO TR KR EG ZA SA PT EE LV LT GR UY

Terms & ConditionsPrivacy PolicyCookie PolicyFAQs

© Bimstore 2026 a spacegroup company

This site uses cookies. By continuing to browse this site you are agreeing to our use of cookies. Find out more here.

Accept